LEAVING OAK VALLEY (TEMPORARILY)

Demolition began today.  The crew from Service Masters arrived at 9:00 a.m. to begin tearing out water damaged flooring and cabinets.  We're looking at a possible four to six week project before we get our home back.


This was my last look at our house before I left for work this morning.  The most visible damage is seen on the floor in front of the refrigerator, where the leak occurred.
When I arrived home after work, kitchen drawers were placed in the garage and in the living room and the kitchen was sealed off from the rest of the house with a plastic wall, using a zipper for access.
Debra packed up a few belongings before leaving the house.
Service Masters left air blowers and a dehumidifier in place to dry out the wet flooring.
The range, several cabinets, and boxed contents from our cabinets fill our garage for now.